| Weekend with operation in Skepptuna 2013 |

|
We managed to design and build a very interesting layout in a relatively small room,12x10 meters. The purpose with the meeting was to build a layout and show our members how fun an operating session can be.
About 20 members came to the operating session on Sathurday and about participated during Sunday.
|
 |
It was minus 27 grader outside but it was warm inside where we had a great time running trains in three operating sessions during two days.
|
 |
Several of the participants had never been part of an american operating session. We gave them a short introdction to the role of a dispatcher and the use of Track Warrants.
|
 |
In the middle is the new module Whits end. Victoria is building it and it will be an eyecatcher when it's finnished.
|
 |
We use car cards and waybills for routing the freight cars.
|
 |
Details from the module Hungry Horse. Matti has renovated the module, Victoria builds and wheathers the houses, Seth takes care of the nature and the threes.
|
| |