 |
|
The layout was about 70 meters from loop to loop
with Charlotte Park as main yard.
Photo: Roland, Magnus and Casper
|
 |
| Charlotte Park has three
arrival/departure tracks and four classification
tracks.. Outside the picture to the right is the
passenger station and engine facility. |
| |
|
|
 |
|
Switches and signals in the yard are
controlled by a computer screen.
|
 |
|
A crew of four is sometimes needed to handle the
yard
|
 |
|
Work orders for the different trains
|
 |
|
Car cards and waybills for scheduling the freight
cars.
|
 |
|
Freight train with 3 EMD F7s have just left
Charlotte Park
|
 |
|
The same train passing over Dry Creek Bridge
|
 |
|
Freight train passing the tower in Split
|
 |
|
Freight cars in Modesto industrial area
|
 |
|
Industry in Legesta
|
 |
|
Brewery in Hungry Horse
|